The programme will be implemented through: Development of the Mombasa Petroleum Trading Hub: It entails development of Very Large Crude Carrier (VLCC) size tankers and a tank farm of at least 800,000MT through Public Private Partnership to provide storage for strategic petroleum stocks; construction of a new oil pipeline from Mombasa to Nairobi (Line-5); construction of a parallel oil pipeline from Sinendet to Kisumu; Kenya – Uganda Oil Pipeline; construction of additional storage tanks at Nairobi Terminal (4 tanks) and at
JKIA Depot ( 2 tanks); installation of a third pump in the Mombasa – Nairobi oil pipeline; expansion of truck loading facilities at Eldoret depot; installation of integrated security system in all KPC’s depots; and upgrading of the oil refinery.
Increased oil and gas exploration and exploitation.